Cash & inventory · Replenishment decisions
The reorder alert says buy. How much can cash support?
Stock need and payment capacity can point to different quantities. Follow a 350-unit replenishment requirement through the delivery dates, supplier terms and a cash limit that supports only 300 units.

Separate the reorder trigger, quantity and payment test
A reorder point signals when to act. A replenishment policy determines the quantity needed. A dated cash forecast tests whether that quantity can be paid for. Keep all three decisions in the worksheet: lowering an order to fit cash changes the stock outcome.
In this example, the reorder trigger is 250 units, the chosen stock target requires a 350-unit order after lot rounding, and the cash schedule permits at most 300 units in valid lots. The original stock and cash conditions have no common solution. Approval needs a changed, evidenced condition rather than an automatic smaller purchase.
Shopify's retailer guide describes the familiar trigger as daily sales velocity multiplied by replenishment lead time, plus safety stock. Oracle's documented min-max method separately calculates the replenishment quantity and applies order modifiers. The worksheet below uses its own explicit coverage target and supplier assumptions; it does not claim an economically optimal order size.
Sources: Shopify — Reorder Point Formula: A Retailer's Guide; Oracle Fusion Cloud SCM 25c — How Min-Max Planning Replenishment Quantities Are Calculated.
A 250-unit trigger leads to a 350-unit order
At the close of 19 October, this SKU has 180 usable units and 60 already-paid units due to become usable after ten days. There are no reservations or backorders in this example. Inventory position is therefore 240 units. Keep that position distinct from the 180 units physically ready to fulfil orders today.
Assume 280 units sold over 28 fully available days, supporting a planning rate of 10 units per day. New replenishment takes 20 calendar days from the decision to usable receipt. A chosen 50-unit safety buffer gives a reorder trigger of 250 units: 10 × 20 + 50. The position is already 10 units below it.
For quantity, choose a target covering 50 days from the decision date plus the same 50-unit buffer: 10 × 50 + 50 = 550 units. Subtract the existing position of 240 to get 310 new units. The supplier requires at least 300 units in multiples of 50, so the smallest order meeting that target is 350 units.
The 50-day horizon and 50-unit buffer are planning choices. Review demand, seasonality, promotions, unavailable selling days and lead-time evidence before selecting them. The buffer carries no assumed service-level probability. Count open customer commitments once, especially when an export's Available figure already excludes committed stock.
Scroll horizontally if needed to see all columns.
| Input or calculation | Value | Basis |
|---|---|---|
| Sales in the observation window | 280 | Units over 28 fully available days |
| Observation window | 28 | Days |
| Planning demand rate | 10 | Units/day · 280 ÷ 28 |
| New replenishment lead time | 20 | Days until stock is usable |
| Chosen safety buffer | 50 | Units |
| Usable stock now | 180 | Units; no reserved orders |
| Confirmed, paid inbound | 60 | Units due on Day 10 |
| Existing inventory position | 240 | 180 + 60 units |
| Reorder trigger | 250 | 10 × 20 + 50 units |
| Chosen coverage horizon | 50 | Days from the decision |
| Target inventory position | 550 | 10 × 50 + 50 units |
| New quantity before lot rounding | 310 | 550 − 240 units |
| Stock-compatible supplier lot | 350 | Minimum 300; multiples of 50 |
Check usable stock on the dates between receipts
An inventory-position total can hide a gap before delivery. The 180 usable units fall to 80 after ten days of demand; the existing 60-unit receipt then lifts stock to 140. Another ten days consume 100, leaving 40 immediately before the new receipt on 8 November. A 350-unit order raises that to 390.
By Day 50, total demand is 500 units and stock is 90: 180 + 60 + 350 − 500. Lot rounding leaves 40 more units than the chosen ending buffer of 50. Before the new receipt, however, stock reaches 40, already below that buffer. A larger order arriving on the same date cannot restore the earlier ten-unit buffer gap.
If the existing 60-unit receipt slips from Day 10 to Day 20, the original 180 units face 200 units of demand before either receipt becomes usable. That exposes 20 units of planned demand before delivery. Revisit availability, backorders or cancellations and their cash effects; the unchanged-receipts cash comparison below would then need revision.
Shopify's inventory states distinguish Available, Committed, Unavailable and Incoming quantities. Incoming stock becomes fulfilment capacity only when received into a usable state. Reconcile the state, location and receipt date before counting it against demand.
Scroll horizontally if needed to see all columns.
| Date / checkpoint | Demand since prior row | Stock before receipt | Usable receipt | Stock after receipt |
|---|---|---|---|---|
| 19 Oct · Day 0 | 0 | 180 | 0 | 180 |
| 29 Oct · Day 10 | 100 | 80 | 60 | 140 |
| 8 Nov · Day 20 | 100 | 40 | 350 | 390 |
| 23 Nov · Day 35 | 150 | 240 | 0 | 240 |
| 8 Dec · Day 50 | 150 | 90 | 0 | 90 |
Sources: Shopify Help Center — Understanding inventory states.
Put the whole new order on its payment dates
The assumed quote is $20 per unit with a 30% deposit on 19 October and the remaining 70% on 2 November. Fixed freight of $600 is payable on 8 November when the goods become usable. Every candidate uses the same price, dates and freight assumption. Requote a quantity if those terms actually differ.
For 350 units, the supplier invoice is $7,000: $2,100 deposit plus $4,900 balance. Freight takes the full cash commitment to $7,600. The invoice is already split between deposit and balance; adding another $7,000 debit would count it twice. The existing paid 60-unit inbound also needs no new payment in this schedule.
Scroll horizontally if needed to see all columns.
| Payment | Due date | 300 units | 350 units | 400 units |
|---|---|---|---|---|
| 30% supplier deposit | 19 Oct | $1,800.00 | $2,100.00 | $2,400.00 |
| 70% supplier balance | 2 Nov | $4,200.00 | $4,900.00 | $5,600.00 |
| Fixed freight | 8 Nov | $600.00 | $600.00 | $600.00 |
| Total new cash commitment | All payments | $6,600.00 | $7,600.00 | $8,600.00 |
The tightest cash date comes after the deposit
Use a baseline that includes the business's other receipts and commitments but excludes this proposed PO. Subtract cumulative candidate payments at each date. The chosen cash floor is $10,000, an owner planning assumption. All three candidates supply the modeled demand through Day 50, so this comparison holds receipts and other costs unchanged.
The 350-unit deposit leaves $11,900, above the floor. After the balance, cash is $11,000. The freight date then takes it to $9,400, a $600 floor breach. Testing only the deposit would miss the binding date.
Cash closes at $17,400 on Day 50 for 350 units, but that later recovery does not fund the earlier payment. Use the full dated forecast and inspect daily or intraday movements around a tight date. Bring the next replenishment and any later commitments into the broader forecast before final authorization.
Scroll horizontally if needed to see all columns.
| Date / checkpoint | Baseline without new PO | 300 units | 350 units | 400 units |
|---|---|---|---|---|
| 19 Oct · after deposit | $14,000.00 | $12,200.00 | $11,900.00 | $11,600.00 |
| 2 Nov · after supplier balance | $18,000.00 | $12,000.00 | $11,000.00 | $10,000.00 |
| 8 Nov · after freight | $17,000.00 | $10,400.00 | $9,400.00 | $8,400.00 |
| 23 Nov · later checkpoint | $21,500.00 | $14,900.00 | $13,900.00 | $12,900.00 |
| 8 Dec · Day 50 | $25,000.00 | $18,400.00 | $17,400.00 | $16,400.00 |
Derive the cash ceiling before rounding the order
For quantity q, the cumulative supplier payment is $6q at the deposit and $20q after the balance. Once freight is due, the cumulative commitment is $20q + $600. At each date, that commitment must fit baseline cash less the $10,000 floor. Take the smallest quantity limit across the full schedule.
On 8 November, baseline headroom is $7,000. After reserving $600 for freight, $6,400 remains for units: $6,400 ÷ $20 = 320. The other shown dates permit more units. Round this capacity down to the supplier's 50-unit lots, giving 300 units. Rounding capacity up to 350 would cross the cash floor.
The 300-unit case leaves $400 above the floor. The next 50-unit lot costs another $1,000 at these terms, so funding the 350-unit case needs $600 beyond that remaining headroom. Keep a demand requirement rounded up and a funding ceiling rounded down distinguishable.
Why the 350-unit order falls below the cash floor
Scroll horizontally if needed to see all columns.
| Cash balance or cumulative effect | Signed amount |
|---|---|
| Baseline cash on 8 November | $17,000.00 |
| Deposit already paid | −$2,100.00 |
| Supplier balance already paid | −$4,900.00 |
| Freight payable by this date | −$600.00 |
| Cash after this PO schedule | $9,400.00 |
The cash-feasible lot still misses the original stock target
A 300-unit purchase satisfies the supplier minimum and keeps modeled cash above $10,000. At Day 50, it leaves 40 units, ten below the chosen 50-unit ending buffer. The 350-unit purchase reaches the stock target after lot rounding, but fails the cash condition. Buying 400 units widens the cash shortfall.
Under the original assumptions, the stock-compatible lower bound is 350 units and the cash-compatible upper bound is 300. No permitted lot lies between those bounds. A smaller order becomes a different decision: accept and document a smaller ending buffer, change delivery or payment terms, or obtain supported cash capacity and retest.
If the supplier minimum increased to 350 while cash still supported only 300, there would be no supplier-compatible cash-feasible lot at all. Do not raise the quantity to the minimum and retain the smaller order's cash result.
Scroll horizontally if needed to see all columns.
| Order units | Total new cash | Lowest modeled cash | Day 50 stock | Cash / ending-stock test |
|---|---|---|---|---|
| 300 | $6,600.00 | $10,400.00 | 40 | Cash passes; ending stock buffer fails |
| 350 | $7,600.00 | $9,400.00 | 90 | Ending stock passes; cash floor fails |
| 400 | $8,600.00 | $8,400.00 | 140 | Ending stock passes; cash floor fails |
An agreed later freight payment changes the low point
As a separate conditional comparison, assume the freight provider agrees to receive the same $600 on 23 November instead of 8 November, with no extra charge or change in usable delivery date. Keep the 350-unit order, supplier deposit, balance, demand and baseline unchanged. This is an assumed revised quote, not an available concession to rely on without agreement.
Cash on 8 November rises from $9,400 to exactly $10,000. On 23 November, the freight payment leaves $13,900. Day 50 still closes at $17,400: the total $7,600 commitment has only moved through time. The modeled floor is met with zero headroom at the low point, leaving no room there for an adverse change.
Test any slower payout or extra debit before approving that narrow result. Shopify Payments distinguishes settlement, payout schedules and bank processing; an order or pending payout is not proof that money will be in the bank before a supplier debit. Support receipt dates with the relevant provider and bank evidence.
Scroll horizontally if needed to see all columns.
| Checkpoint | Freight paid 8 Nov | Agreed freight paid 23 Nov |
|---|---|---|
| 19 Oct · after deposit | $11,900.00 | $11,900.00 |
| 2 Nov · after supplier balance | $11,000.00 | $11,000.00 |
| 8 Nov · original freight date | $9,400.00 | $10,000.00 |
| 23 Nov · revised freight date | $13,900.00 | $13,900.00 |
| 8 Dec · Day 50 | $17,400.00 | $17,400.00 |
Sources: Shopify Help Center — Understanding Shopify Payments payout timing.
Approve a quantity together with its conditions
Retain the stock export, open receipts and usable dates, demand basis, selected buffer and horizon, supplier quote, dated cash baseline and scenario version. Record which original condition changes and who confirms it. Recheck the calculation when quantity, price, payment date, delivery or expected collections change.
For this example, the original 350-unit request needs revised terms or more supported headroom. A 300-unit request needs explicit acceptance of the smaller ending buffer and a follow-up replenishment plan. Even the conditional freight solution needs the agreement, daily cash review and the pre-arrival buffer exposure addressed.
- Reconcile usable stock, incoming supply and existing commitments without counting the same units twice.
- Calculate the reorder trigger and the separate order quantity under the chosen coverage policy.
- Trace stock between receipt dates; flag any expected buffer breach or unmet demand before delivery.
- Apply the actual supplier minimum and lot increments, then insert every deposit, balance and logistics payment once.
- Compare the stock-compatible lower bound with the dated cash-compatible upper bound; keep a no-solution result visible.
- Attach agreed changed terms or an explicitly accepted stock policy, extend the wider forecast and authorize only the evidenced scenario.
Bring the conflicting stock and cash numbers to the audit
Choose one replenishment alert where the preferred quantity does not fit the cash forecast. Bring the demand calculation, incoming-stock dates, supplier terms and the date with least headroom. State the condition that would need to change before purchase approval.
The free initial operating-finance audit can help frame that question against the records available. Review its scope and prepare your brief. The linked audit page lets you prepare and copy the brief; it does not send an application.
Sources and calculation notes
- Shopify — Reorder Point Formula: A Retailer's Guide
The reorder trigger combines daily sales velocity, replenishment lead time and a selected safety-stock quantity.
Accessed 2026-10-19.
- Oracle Fusion Cloud SCM 25c — How Min-Max Planning Replenishment Quantities Are Calculated
A documented replenishment method separates the order trigger from order quantity, considers supply/demand scope and applies minimums and lot modifiers.
Accessed 2026-10-19.
- Shopify Help Center — Understanding inventory states
On-hand, available, committed, unavailable and incoming inventory have distinct meanings; incoming supply requires receipt into a usable state.
Accessed 2026-10-19.
- Shopify Help Center — Understanding Shopify Payments payout timing
Settlement, payout schedules, account conditions and bank processing affect when sales proceeds reach the bank.
Accessed 2026-10-19.